Douglas bathroom package

Douglas Complete Bathroom Package

A complete fresh look for the modern home

Images are for illustration purposes only and may differ slightly from the package. Call into our showroom for more details.

Fully Fitted Bathroom Package

Complete transformation - your old bathroom out, fully fitted new bathroom in.
£ 7,650
  • Old Bathroom Fully Removed
  • 1700mm Single Ended Bath, Square Style Cubix Bath Taps and Wastes, Bath Front Panel
  • Shower Screen
  • Modern Thermostatic Shower with Choice of Slider Rail Kit or UPGRADE to a Rain Shower Head
  • Modern Basin with Wall Hung Vanity Unit Available in a Range Of Colours up to 60cm, Square Cubix Style Basin Mixer with Click Waste
  • Back To Wall WC Pan Including Soft Close Seat, Geberit Concealed Cistern with Chrome Flush Plate To Match or a Close Coupled Pan Cistern and Soft Close Seat
  • LED Mirror
  • Modern Designer Heated Towel Rail With All Chrome Thermostatic Valves
  • Up to 20m² of Wall and Floor Tiling - Feature tiles included. Choice of PORCELANOSA Tiles
  • Two Packs of Modern Ceiling Panels with Built in Led Lighting
  • All Waste Removed From Site On Completion
BEST SELLER
Hamilton bathrooms and Kitchens guarantee

What is the process of a standard bathroom installation?

This is a question we are often asked.
From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around three weeks. From then the Bathroom Installation team turn up on Monday morning around 9am.

  • The first day involves stripping out your existing bathroom and getting the plumbing in place for your brand new bathroom.
  • Day two generally involves preparing your walls and floor for tiling by repairing or sheeting to get the best results.
  • Days three and four are busy tiling and finishing ready for the bathroom essentials.
  • Day five should see the installation completed and the bathroom all sealed and finished off and all rubbish removed from site

 

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

bathroom installation close up
No.1 choice for bathrooms in Lanarkshire

Book a Survey Today with Lanarkshire's No.1 Choice