Grande bathroom package

Grande Complete Bathroom Package

A fantastic modern package to uplift your home

Images are for illustration purposes only and may differ slightly from the package. Call into our showroom for more details.

Fully Fitted Bathroom Package

Complete transformation - your old bathroom out, fully fitted new bathroom in.
£ 7,450
  • Old Bathroom Fully Removed
  • 1000x800 Offset Quadrant Including Stone Tray and 90mm Fast Flow Waste (other size options available)
  • Twin Thermostatic Combination Shower
  • Modern Vanity Unit with Choice of Colours
  • WC Set with Soft Close Seat
  • LED Mirror With Colour Changing Options
  • Modern Designer Heated Towel Rail and All Chrome Thermostatic Valves (Choice of Colours)
  • Up to 20m² of Wall and Floor Tiling Feature Tiles Included, Choice of PORCELANOSA Tiles
  • Two Packs of Modern Ceiling Panels with Built in Led Lighting
  • All Waste Removed From Site On Completion
Hamilton bathrooms and Kitchens guarantee

What is the process of a standard bathroom installation?

This is a question we are often asked.
From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around three weeks. From then the Bathroom Installation team turn up on Monday morning around 9am.

  • The first day involves stripping out your existing bathroom and getting the plumbing in place for your brand new bathroom.
  • Day two generally involves preparing your walls and floor for tiling by repairing or sheeting to get the best results.
  • Days three and four are busy tiling and finishing ready for the bathroom essentials.
  • Day five should see the installation completed and the bathroom all sealed and finished off and all rubbish removed from site

 

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.