Nuvola Complete Bathroom Package
A stunning modern package to uplift your home
Images are for illustration purposes only and may differ slightly from the package. Call into our showroom for more details.
What is the process of a standard bathroom installation?
This is a question we are often asked.
From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around three weeks. From then the Bathroom Installation team turn up on Monday morning around 9am.
- The first day involves stripping out your existing bathroom and getting the plumbing in place for your brand new bathroom.
- Day two generally involves preparing your walls and floor for tiling by repairing or sheeting to get the best results.
- Days three and four are busy tiling and finishing ready for the bathroom essentials.
- Day five should see the installation completed and the bathroom all sealed and finished off and all rubbish removed from site
This is a general rule of thumb although larger bathrooms can obviously take longer to complete.
Fully Fitted Bathroom Package
Complete transformation - your old bathroom out, fully fitted new bathroom in. £ 8,595
- Old Bathroom Fully Removed
- 1700x700 bath inc Leg Set and Front Panel
- Thermostatic Shower Mixer Suitable for Over Bath Use
- Furniture Set 1000mm including 1 Piece Basin and Worktop
- Basin and Btw Wc Pan Including Concealed Cistern
- LED Mirror with Colour Changing Options
- Modern Designer Heated Towel Rail and All Chrome Thermostatic Valves (Choice of Colours)
- Up to 22m² of Wall and Floor Tiling Feature Tiles Included, Choice or PORCELANOSA Tiles
- Two Packs of Modern Ceiling Panels with Built in Led Lighting
- All Waste Removed From Site On Completion
Book a Survey
Our price includes full installation, stripping out and disposing of your old bathroom, all trades required, all materials required and no hidden extras. T&C’s Apply.
BEST SELLER