Fully Fitted Kitchen Package
Complete transformation - your old kitchen out, fully fitted new kitchen in. from £8995
- Old Kitchen Fully Removed
- Minor Plastering Works up to maximum 10 sq m
- 4 door colour choices and choice of carcass colours
- 2 Lengths of 3 Meter Worktops Choice of 18 Colour Options
- Choice of Bosch or Hotpoint Oven Hob and Hood ***NEFF UPGRADES AVAILABLE - PLEASE ASK A MEMBER OF STAFF FOR DETAILS
- All Waste Removed on Completion
- Fully Certified and Guaranteed Workmanship
- Add a Laminate floor from only £150 for up to 10 sq m fully fitted- Choice of 16 colours
- Choice of Ceiling finishes available POA
Book a Survey
Our price includes full installation, stripping out and disposing of your old kitchen, all trades required, all materials required and no hidden extras. T&C’s Apply. Upgrades Available UPGRADE TO STONE WORKTOPS FROM ONLY £750! Ask for details - T&C's Apply
What is the process of a standard kitchen installation?
This is a question we are often asked.
From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around two to three weeks. From then the Kitchen Installation team turn up on Monday morning around 9am and start your dream home improvement.
- The first day involves stripping out your existing kitchen and getting the first fix electrics and plumbing in place to suit the new design, as well as this any wall areas and flooring issues are made good.
- Day two generally involves preparing your walls and floor by plastering.
- Days three and four are busy days installing the new kitchen, cutting out and preparing worktops for installation and most importantly installing all the new appliances.
- Day five should see the installation completed and the kitchen all sealed and finished off and all waste removed from site on completion.
This is a general rule of thumb although larger kitchens can obviously take longer to complete and smaller kitchens can take less time to complete.