Turin Charcoal / Dusky Pink Complete Package
A stunning modern kitchen with 2 tone colouring to compliment any modern home
Images are for illustration purposes only and may differ slightly from the package. Call into our showroom for more details.
Fully Fitted Kitchen Package
Complete transformation - your old kitchen out, fully fitted new kitchen in. from £9,950
- Old Kitchen Fully Removed
- Minor Plastering Works up to maximum 10 sq m
- Up to 10 Units with Choice of Colours
- 2 Lengths of 3 Meter Worktops Choice of 30 Colour Options
- Choice of Bosch or Hotpoint 4 Burner Gas Hob- ***NEFF UPGRADES AVAILABLE PLEASE ASK A MEMBER OF STAFF FOR DETAILS!
- Choice of Single Electric Oven
- Choice of Chimney Hood
- All Waste Removed on Completion
- Fully Certified and Guaranteed Workmanship
- Add a Laminate floor from only £150 fitted for up to 10 sq m- Check in store or ask a member of our team for more details
Upgrades Available
- UPGRADE TO STONE WORKTOPS FROM ONLY £750! Ask for details - T&C's Apply
- ADD UP TO 15 SQ M LAMINATE FLOORING AND UNDERLAY FOR £250! Ask for details - T&C's Apply
- CHOICE OF INTEGRATED APPLIANCES
- NEW CEILING WITH SPOTLIGHTS
- UNDER UNIT LED's
- DESIGNER RADIATORS
- COMBI MICROWAVE
- BOILING WATER TAPS
- MODULEO FLOORING
What is the process of a standard kitchen installation?
This is a question we are often asked.
From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around two to three weeks. From then the Kitchen Installation team turn up on Monday morning around 9am and start your dream home improvement.
- The first day involves stripping out your existing kitchen and getting the first fix electrics and plumbing in place to suit the new design, as well as this any wall areas and flooring issues are made good.
- Day two generally involves preparing your walls and floor by plastering.
- Days three and four are busy days installing the new kitchen, cutting out and preparing worktops for installation and most importantly installing all the new appliances.
- Day five should see the installation completed and the kitchen all sealed and finished off and all waste removed from site on completion.
This is a general rule of thumb although larger kitchens can obviously take longer to complete and smaller kitchens can take less time to complete.